Net metering lets you export surplus solar electricity to the grid and receive credit against the units you draw at night or on cloudy days. A bi-directional meter records both flows and your bill is based on the net difference. In Sindh the application is made through your distribution company — HESCO for Hyderabad — and requires an approved installer, equipment certification and an inspection. We handle the technical documentation and coordinate the application on your behalf.
Quick summary
Gexton Security installs solar power systems in Hyderabad and Sindh for homes, offices, commercial buildings, factories and institutions. Options include on-grid systems with net metering, off-grid systems with battery storage, and hybrid systems combining both. The service covers energy assessment, system design, panel and inverter installation, safe wiring, battery backup, net metering paperwork and after-sales maintenance.
Solar Installation System
Power Your Home, Save Energy, and Build a Brighter Future
We provide professional Solar Installation System services for homes, offices, commercial buildings, factories, and institutes. Our solar energy solutions make it easier for you to generate your own electricity, reduce monthly power bills, and enjoy a reliable energy system for your daily needs. It is a complete solution that includes proper planning, system design, installation, and setup according to your energy requirements. With quality solar panels, safe wiring, and professional installation, you can improve energy efficiency and reduce dependency on traditional electricity sources. Now, being the owner of your home or business, you can feel relaxed knowing that your energy system is smart, reliable, and cost-effective. Our Solar Installation System service is designed to support modern power needs, provide long-term savings, and make your property ready for a sustainable future.
Request a Free QuoteContact us
Call +92 301 8222720
or fill out the form below
Frequently Asked Questions
Straight answers about solar installation system in Hyderabad and across Sindh. Still unsure? Call +92-301-8222720.
On-grid is the most economical and gives the fastest payback through net metering, but it shuts down during a grid outage for safety, so it provides no load-shedding backup. Off-grid runs entirely on batteries and suits locations with no reliable grid at all, but battery cost is significant. Hybrid combines both — you get net metering savings plus battery backup during outages — and for most Hyderabad homes and businesses dealing with load shedding, hybrid is the practical recommendation.
A correctly sized system typically offsets the majority of daytime consumption, and with net metering the export credit can offset a large share of night usage as well. The exact figure depends on your consumption pattern, roof area and system size. We calculate a projected monthly saving and a payback period from your last twelve months of bills before you commit, so the numbers are based on your actual usage rather than a generic estimate.
As a working figure, each kilowatt of panels needs roughly 60 to 80 square feet of unshaded roof, so a 10kW system needs approximately 600 to 800 square feet. Shading from water tanks, parapet walls, neighbouring buildings and trees reduces usable area, which is why we assess the roof physically and check shading across the day rather than working from dimensions alone.
Quality panels carry performance warranties of 25 years and typically still deliver around 80 percent of rated output at the end of that period. Inverters have a shorter service life, generally 8 to 12 years, and batteries in hybrid or off-grid systems depend on chemistry — lithium units substantially outlast lead-acid. Panels need periodic cleaning, which matters especially in dusty Sindh conditions where soiling can noticeably reduce output.
Yes. Maintenance covers panel cleaning, tightening of mounting structures, inverter health checks, battery testing, wiring inspection and output verification against expected generation. Dust accumulation is the most common cause of underperformance in this region, so we recommend scheduled cleaning as part of an annual contract.